Weymouth: Construction at the Fore River Bridge to Impact Traffic

In Weymouth, commuters should be aware that traffic will be impacted by construction connecting the new Fore River Bridge to ramps and roadways

Jonathan Gulliver, Acting Highway Administrator of the Massachusetts Department of Transportation explains:

Gulliver says there have been road signs placed along 3A to help commuters, but still advises using other forms of transportation:

Gulliver also recommends using the commuter rail or the Plymouth/Brockton bus line.

This phase of the construction will end September 1st.

 


Reach Thousands of Potential Customers on The South Shore and Beyond! Call WATD Today for More Info on Radio and Internet Advertising: (781) 837-1166

watd signal 2017 small

About Amy Leonard

Amy Leonard grew up in Carver and always had a passion for radio. She studied radio production at New England Institute of Technology in Rhode Island, then moved to Martha's Vineyard where she worked as a DJ at WVVY producing the midday show called PB and Jams. She has since then camped across the country to California but has made her way back to the only home she knows, the South Shore.