Plymouth: Safety Expert Gives Presentation Regarding Decommissioning at Pilgrim

Even his critics called him brilliant. Paul Branch, nuclear power engineer and safety expert, made a presentation to the Nuclear Decommissioning Citizens Advisory Panel, NDCAP, Thursday night. He said the NRC colludes with the nuclear energy industry and that Holtec, the company decommissioning the Pilgrim nuclear power plant in Plymouth, has poorly designed storage casks for the nuclear waste on the Pilgrim site.

WATD’s Charles Mathewson has this report.

About Charles Mathewson

Charles Mathewson worked in print journalism for more than two decades as a reporter and editor, and has won several regional and national awards. He resides in Plymouth where he writes fiction and paints, when not producing award-winning news as a reporter for WATD.